← Back to Home

ReDew Anson

Jones County, Texas · ERCOT West

600
MW Cleared Interconnection

A data center and long-duration energy campus at Phantom Hill 345 kV — built out in phases behind an anchor tenant. Phase 1 energized mid-2028.

ReDew Anson project site aerial view

Campus footprint in the NW corner of the parcel, adjacent to Phantom Hill 345 kV · Jones County, Texas

Land Control
165 acres controlled
Environmental
Complete
Interconnection
TSP Application Preparing to File
Configuration
Battery In-Series
Target NTP
Mid-2027
Phase 1 Energized
Mid-2028

Project Specifications

Built for ERCOT. Built for tenants. Built to last.

Technical

  • Cleared IC600 MW
  • POIPhantom Hill 345 kV
  • ConfigurationBattery In-Series
  • BatteryVanadium Flow — 10-Hour
  • On-Site GenerationNatural Gas — Partner-Owned
  • ISO RegionERCOT West

Location

  • CountyJones County, TX
  • Adjacent GenerationENGIE Anson Solar
  • Stargate Proximity~19 mi (Abilene)
  • POI Studied To2 GW (N-0)

Timeline

  • Development Start2025
  • TSP ApplicationPreparing to File
  • Signed Position & NTPH1 2027 · Mid-2027
  • Phase 1 EnergizedMid-2028

Project Partners

Proven teams. Established relationships.

Technology & Turnkey

Technology Partner

Long-duration vanadium flow battery on turnkey scope, with campus architecture, site design, and interconnection engineering by EPE working directly with Lone Star Transmission.

Gas Supply Procurement

Unified Energy

Procures natural gas supply for the on-site generation fleet operated by our power-generation partner.

Fiber Connectivity

FiberLight

Tenant-grade fiber connectivity. Quote received; LOI in process.

Interested in ReDew Anson?

We're open to conversations about tenant capacity, strategic partnership, and investment.