Long-duration tech. Long-term thinking.

Firm power
for compute.

Built-to-suit data centers, from 5 MW to 500 and beyond.

On-siteBehind the meter
5–500 MWBuilt to suit
10-hourBattery
6–12 moModular build
Why we exist

Compute has a power problem.

Chips, capital and land can be bought. A place in line can't. Our sites bring their own power.

400+ GW

Waiting in the ERCOT large-load queue

5–7years

Typical wait for a new grid connection

0applications

Needed to energize our first phase

The system

Every megawatt passes
through the battery.

The load sees clean, conditioned power. The source never sees the swings of AI compute.

01 · SourceFirm supplyFirm natural gas, or utility service at the edge.
02 · GenerationOn-site turbinesN+1, owned and operated by a power producer.Turbine output
03 · Storage10-hour flow batteryNon-flammable. Replaces the UPS.Absorbs the swing
04 · ConversionInvertersRide-through built in.
05 · LoadModular data hallsPrefabricated and liquid-cooled.AI load
Grid tie · secondaryExport and backup.
Solutions

One system. Two scales.

Same battery. Same modular halls. Same lease.

Built to suit

5 MW or 500.
Same building block.

Modular halls, battery and generation, sized to your racks and your ramp.

50MW of IT
5 MW500 MW
MW
FormatBuilt to suit
Battery500 MWh · 10-hour
Blocks10 × 5 MW
Each block = 5 MW · drag the slider or click a blockRequest 50 MW →
Data sovereignty

Your power.
Your hardware.
Your data.

Know where client information lives, and who can reach it.

01 / Your power

Independent of the grid

Uptime that doesn't hinge on anyone else.

02 / Your hardware

Single-tenant by design

Your servers, your network, your keys.

03 / Your data

On U.S. soil

A facility you can name, visit and audit.

What sets it apart

Same megawatts.
A different line to stand in.

01 / Speed

Power that doesn't wait on a queue

On-site generation first. Factory-built halls in 6–12 months.

02 / Power quality

A battery in series, not on the side

AI load swings are absorbed at the battery.

03 / Alignment

Rent is the product. Power is at cost

Triple-net lease. No margin on energy.

Partner with us

Tell us which seat you're in.