01 / Your power
Independent of the grid
Uptime that doesn't hinge on anyone else.
Built-to-suit data centers, from 5 MW to 500 and beyond.
Chips, capital and land can be bought. A place in line can't. Our sites bring their own power.
The load sees clean, conditioned power. The source never sees the swings of AI compute.
Same battery. Same modular halls. Same lease.
Modular halls, battery and generation, sized to your racks and your ramp.
Know where client information lives, and who can reach it.
Uptime that doesn't hinge on anyone else.
Your servers, your network, your keys.
A facility you can name, visit and audit.
On-site generation first. Factory-built halls in 6–12 months.
AI load swings are absorbed at the battery.
Triple-net lease. No margin on energy.