01 / No queue
Behind the meter first
The grid tie follows in parallel.
On-site power and modular data halls. Built in phases to your roadmap.
Powered on site. No grid application to energize.
The grid tie follows in parallel.
Factory-built halls in 6–12 months.
Passed through on a triple-net lease.
AI load swings are absorbed at the battery and never reach the turbines.
The same power path and modular halls every time. Phased, sized and timed to the tenant.
In-service high-voltage substation at the fence line; 100+ acres.
A dedicated lateral built by the pipeline.
Energized on IPP-owned generation; no grid application to start.
Blocks added as you need them, each financed and leased on its own.